COLUMN COVER SYSTEMS

SPECIFICATION GUIDE

SECTION 05 58 13 - Column Covers NorthClad®
CL Series Column Covers
Published: 07/2013

PART 1 GENERAL

  • 1.1 SUMMARY
    1. Section Includes:
      1. Column covers.
    2. Related Sections:
      1. Section 01 43 13 – Manufacturer Qualifications
      2. Section 01 43 19 – Fabricator Qualifications
      3. Section 05 05 13 – Shop-Applied Coatings for Metal
      4. Section 05 05 23 – Metal Fastenings
      5. Section 05 50 00 – Metal Fabrications
      6. Section 07 62 00 – Sheet Metal Flashing and Trim
      7. Section 07 90 00 – Joint Protection

    1.2 REFERENCES

    1. Reference Standards: Current edition at date of Bid.
    2. American Architectural Manufacturers Association (AAMA):
      1. AAMA 605.2 – Specification for High Performance Organic Coatings on Architectural Extrusions and Panels.
    3. ASTM International:
      1. ASTM B209 – Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate.
      2. ASTM B117 – Standard Practice for Operating Salt Spray (Fog) Apparatus.
      3. ASTM D294 – Method of Tumbler Test for Coke.
      4. ASTM D659 – Method of Evaluating Degree of Chalking of Exterior Paints.
      5. ASTM D968 – Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive.
      6. ASTM D2244 – Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates.
      7. ASTM D2247 – Practice for Testing Water Resistance of Coatings in 100% Relative Humidity.
      8. ASTM D3352 – Standard Test Method for Strontium Ion in Brackish Water, Seawater, and Brines.
      9. ASTM E84 – Standard Test Method for Surface Burning Characteristics of Building Materials.

    1.3 ADMINISTRATIVE REQUIREMENTS

    1. Coordination and Sequencing of the Work: Conform to Section 01 31 13 for coordination with work of other Sections and Section 01 32 16 to coordinate fabrication schedule with construction progress to avoid delaying the Work.
    2. Preconstruction Meetings: Conform to provisions of Section 01 31 19.
      1. Attendance: Contractor, Applicator, Owner, Architect, and those specifically requested to attend.
      2. Meeting Time: Minimum 3 weeks prior to beginning work of this Section and related work affecting work of this Section.
      3. Location: Project Site.
Scroll to Top